| 
 Toyota Land Cruiser, Amazon, LX470 Lexus
 + Identification numbers of the car
 + Governing bodies and methods of safe operation of the car
 + Settings and routine maintenance of the car
 -  Engine
 + Typical procedures of service of engines
 + Procedures of service of the petrol engine
 -  Procedures of service of the diesel engine
 Removal, installation, dismantling and assembly of a head of cylinders
 Removal and installation of the inlet pipeline and final collector
 Removal, check of a state and installation of a belt of the GRM drive
 Removal and installation of cogwheels of the GRM drive
 Replacement of a forward epiploon of a cranked shaft and epiploons of a camshaft and TNVD
 Replacement of a back epiploon of a cranked shaft
 Removal and installation of camshafts and pushers of valves
 Removal and installation of the pallet of a case of the engine
 Removal, check of a state and installation of the oil pump
 Removal and installation of the oil cooler
 Removal and installation of a driving disk
 + Cooling systems of the engine, heating of salon and air conditioning
 + the Power supply system and production of the fulfilled gases
 + Electric equipment of the engine
 + Control systems of the engine and decrease in toxicity of the fulfilled gases
 + gear shifting Box
 + Transmission line
 + Brake system
 + Suspension bracket and steering
 + Body
 + Onboard electric equipment
 
 
 
 
 
 | 
 
 Removal, check of a state and installation of the oil pump  Removal  
|  |  
| 
| 1. Remove the case pallet (see the Section Removal and installation of the pallet of a case of the engine). 
 
3. Remove a final branch pipe of the cooling system.
|  | 2. Apply adjusting tags on TNVD and the oil pump (address to an accompanying illustration). |  
 
|  | 4. Give fixture and remove the case of the oil pump (address to an accompanying illustration). |  
6. Scratch out all traces of sealant and material of old laying from the interfaced surfaces of the pump and block of the engine, then wipe surfaces the rags moistened in acetone.
|  | 5. For dismantling of the pump take out its conducted gear wheel (address to an accompanying illustration), turn out a stopper of the reducing valve and remove the valve, laying and a spring. |  |  |  Check  
|  |  
| 
| 1. Wash out all components in solvent, then check them for existence of signs of excessive wear and mechanical damages. 2. Examine the rubbing surfaces of components of the reducing valve, estimate a condition of a valvate spring. In case of need make replacement of the valve assembled.
 |  |  Installation  
|  |  
| 
| 1. Lay in a pump housing the conducting and conducted gear wheels marking towards a cover. 2. Oil components of the reducing valve pure motive and establish them on the regular place. Delay a stopper new sealing laying.
 
 
|  | 3. Impose a RTV sealant pillow on the interfaced pump surface (address to an accompanying illustration). |  
4. Tighten bolts of fastening of the case of the oil pump with effort of 20 Nanometers.
|  | 3. Impose new rubber consolidation (address to an accompanying illustration). 
|  | Installation of the pump has to be complete within five minutes after sealant imposing.  |  |  5. Establish TNVD, I am guided by the tags put earlier.
 
 
7. Grease a stopper carving with the stiffening sealant and screw a stopper into place.
|  | 6. Turn out a stopper of the oil pump a six-sided key on 5 mm (address to an accompanying illustration) and fill in in the pump about 10 cm 3 motive oils. |  8. Establish an oil receiver with new laying.
 9. Install the case pallet.
 10. Add necessary amount of engine oil, start the engine and check it for existence of signs of development of leaks.
 11. Double-check the level of motive oil.
 |  |  
 | 
 
 
 
 
 
 |