Toyota Land Cruiser 100/Amazon, Lexus LX 470

since 1997 release

Repair and operation of the car



Toyota Land Cruiser, Amazon, LX470 Lexus
+ Identification numbers of the car
+ Governing bodies and methods of safe operation of the car
+ Settings and routine maintenance of the car
- Engine
   + Typical procedures of service of engines
   + Procedures of service of the petrol engine
   - Procedures of service of the diesel engine
      Removal, installation, dismantling and assembly of a head of cylinders
      Removal and installation of the inlet pipeline and final collector
      Removal, check of a state and installation of a belt of the GRM drive
      Removal and installation of cogwheels of the GRM drive
      Replacement of a forward epiploon of a cranked shaft and epiploons of a camshaft and TNVD
      Replacement of a back epiploon of a cranked shaft
      Removal and installation of camshafts and pushers of valves
      Removal and installation of the pallet of a case of the engine
      Removal, check of a state and installation of the oil pump
      Removal and installation of the oil cooler
      Removal and installation of a driving disk
+ Cooling systems of the engine, heating of salon and air conditioning
+ the Power supply system and production of the fulfilled gases
+ Electric equipment of the engine
+ Control systems of the engine and decrease in toxicity of the fulfilled gases
+ gear shifting Box
+ Transmission line
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


99e20293




Removal and installation of the pallet of a case of the engine

Details of installation of the pallet of a case and oil pump

1, 13 — the case Pallet
2, 5, 11 — Laying
3, 12 — Maslozabornik
4 — the Case of the oil pump
6 — the Conducted gear wheel

7 — the Spring
8 — the Reducing valve
9 — the Washer
10 — the Back cover of a belt of the GRM drive
14 — the Washer

Removal

 PERFORMANCE ORDER

1. Elements of installation of the pallet of a case of the engine and oil pump are shown on an illustration above.
2. Remove GRM drive details (see the Section Removal and installation of cogwheels of the GRM drive).
3. Merge cooling liquid.
4. Merge motive oil and remove an oil filter.
5. Give fixture of the pallet of a case then separate it from the engine block, in case of need having accurately hooked it a small screw-driver or the pallet, try not to damage the interfaced surfaces.
6. If necessary remove a maslozabornik with laying.

Installation

 PERFORMANCE ORDER

1. Accurately scratch out all traces of sealant and material of old laying from the interfaced surfaces of the pallet and block. Carefully wipe the interfaced surfaces the rags moistened in acetone. Clean a carving of deaf bolted openings in aluminum molding of the block.
2. Check a condition of the mesh filter of a maslozabornik, wash out solvent a maslozaborny tube, replace sealing laying, establish assembly of a maslozabornik on the engine and with the demanded effort tighten fixing bolts.
3. If removed, establish into place a maslozabornik with new laying, tightening bolts of his fastening with the demanded effort.
4. Impose the sealant 2 - 3 mm thick roller on the specified surfaces (address to an accompanying illustration).
5. Accurately press the pallet to the block of the engine and screw fixing bolts. Moving from the center outside, in three-four receptions tighten fixture with the demanded efforts.
6. Further installation is made as it should be, the return to an order of dismantle of components. Tighten fixture with the demanded effort. Do not forget to replace the filter and to add oil.
7. Start the engine and check the pallet for existence of signs of development of leaks. Check also oil pressure.