Toyota Land Cruiser 100/Amazon, Lexus LX 470

since 1997 release

Repair and operation of the car



Toyota Land Cruiser, Amazon, LX470 Lexus
+ Identification numbers of the car
+ Governing bodies and methods of safe operation of the car
+ Settings and routine maintenance of the car
+ Engine
+ Cooling systems of the engine, heating of salon and air conditioning
+ the Power supply system and production of the fulfilled gases
+ Electric equipment of the engine
+ Control systems of the engine and decrease in toxicity of the fulfilled gases
+ gear shifting Box
- Transmission line
   Specifications
   Driveshafts and hinges - the general information
   Check of a condition of the transmission line
   Removal and installation of the driveshaft
   Replacement of cardan hinges
   Driving shaft / half shafts, - the general information and check of a state
   Removal and installation of half shafts, bearings and epiploons of the back bridge
   Replacement of an epiploon of the leading gear wheel of differential
   Removal and installation of assembly of the back bridge
   Removal and installation of power shafts
   Replacement of protective covers and service of CV JOINTS
   Removal and installation of assembly of forward differential
   Removal and installation of naves with the switched-off drive
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


99e20293




Removal and installation of naves with the switched-off drive

Details of installation of a nave with manual shutdown of the drive of forward wheels

1 — the Conic washer
2 — the Nut
3 — Sealing laying
4 — the nave Case

5 — the Bolt
6 — Sealing laying
7 — a nave Cover

Nave lock components with manual shutdown of the drive

1 — the Lock ring
2 — the Remote ring
3 — the nave Case
4 — the Lock ring
5 — the Gear ring of a nave
6 — the Internal nave
7 — the Coupling of coupling of the lock of a nave

8 — Drove
9 — the Lock ring
10 — the Steel ball with a spring
11 — a nave Cover
12 — the Spring
13 — the Spring
14 — the Handle of management with an epiploon


 PERFORMANCE ORDER

1. Transfer a nave cover to the situation Free (Freely).
2. Turn out fixing bolts, then uncover also internal components of a nave (address to an illustration of the Detail of installation of a nave with manual shutdown of the drive of forward wheels).
3. At the corresponding complete set turn out a bolt from an end face of a power shaft.
4. Give nuts of fastening of the case of a nave.
5. By means of a brass drift bring down conical washers from assembly.
6. Remove the nave case from the pin of a power shaft equipped with vents.
7. Failure of locks of turning on of the drive of naves most often happens owing to hit in them of dirt and moisture. If there is a need for further dismantling of a nave, try to pay the closest attention to an order and a way of installation of each of components. Put components on a workbench as their dismantle. Serially wipe each of details, grease components with universal greasing, then establish them on the regular places (address to an illustration nave lock Components with manual shutdown of the drive).
8. Installation of components of a nave is made as it should be the return to an order of their dismantle. Do not forget to replace sealing laying and to grease vents of an internal insert with universal greasing. Before installation the handle of management on a cover of a nave has to be turned in the situation Free, track correctness of input in gearing of uvulas drove with the assembly case sites deprived of teeths.