Repair of Opel Corsa C, from 2000 to 2005 of release.
1. Operation and car maintenance
2. Engine
2.1. Petrol engines Z10XE, Z10XEP, Z12XE, Z12XEP DOHC-I
2.2. Mechanical part of petrol engines Z10XE, Z10XEP, Z12XE, Z12XEP DOHC-I
2.3. Cooling system
2.4. Greasing system
2.5. Injection system
2.6. Petrol engines – the general procedures of check
2.7. Mechanical part of the engine
2.8. Verifying and repair operations of components of a mechanical part of the engine
2.9. Cooling system
2.10. System of injection of fuel of petrol engines
2.10.1. Removal and installation of fuel nozzles
2.10.2. Replacement топливопровода a high pressure (The pump of a high pressure – the pressure head chamber)
2.10.3. Module of the fuel pump
2.10.4. Replacement of the module of a dosage
2.10.5. Replacement of a regulator of pressure of fuel
2.10.6. Replacement of the dempfiruyushchy case of return of fuel
2.10.7. Fuel level sensor replacement
2.10.8. Fuel tank
2.10.9. Replacement of a tube of a jellied mouth of a fuel tank (petrol engines)
2.10.10. Catching system паров fuels
2.10.11. Replacement of a forward ventilating tube
2.10.12. Removal and capacity installation with absorbent carbon
2.10.13. Removal and installation of the sensor of a mass consumption of air
2.10.14. Release system (Z 14 XEP, Z 14 XEL, Z 16 XEP)
2.10.15. System of release (Z18 XE)
2.11. Greasing system
3. Transmission
4. Running gear
5. Steering mechanism
6. Brake system
7. Onboard electric equipment
8. Body
9. Electric equipment schemes
 








99e20293



2-10-13-snyatie-i-ustanovka-datchika-massovogo-raskhoda-vozdukha.html

2.10.13. Removal and installation of the sensor of a mass consumption of air

Removal
Open a cowl
Remove the sensor of a mass consumption of air.
For this purpose disconnect the socket of a plait of wires and 2 hoses of an air inlet.
Remove 2 collars.

Installation
Establish the sensor of a mass consumption of air.
Connect an air inlet hose.
Tighten 2 collars the moment of 3.5 N · m.
Connect the socket of a plait of wires.
Close a cowl.

«on page back
2.10.12. Removal and capacity installation with absorbent carbon
on the following page»
2.10.14. Release system (Z 14 XEP, Z 14 XEL, Z 16 XEP)