Repair of Opel Corsa C, from 2000 to 2005 of release.
1. Operation and car maintenance
2. Engine
2.1. Petrol engines Z10XE, Z10XEP, Z12XE, Z12XEP DOHC-I
2.2. Mechanical part of petrol engines Z10XE, Z10XEP, Z12XE, Z12XEP DOHC-I
2.3. Cooling system
2.4. Greasing system
2.5. Injection system
2.6. Petrol engines – the general procedures of check
2.7. Mechanical part of the engine
2.8. Verifying and repair operations of components of a mechanical part of the engine
2.8.1. Gap check in a rod the bearing
2.8.2. Gap check in a rod the bearing
2.8.3. Replacement of the shatunny bearing
2.8.4. Replacement of piston rings
2.8.5. Piston replacement with a rod
2.9. Cooling system
2.10. System of injection of fuel of petrol engines
2.11. Greasing system
3. Transmission
4. Running gear
5. Steering mechanism
6. Brake system
7. Onboard electric equipment
8. Body
9. Electric equipment schemes
 








Soap2day 99e20293



2-8-2-proverka-zazora-v-shatunnom-podshipnike.html

2.8.2. Gap check in a rod the bearing

NOTE
Check is carried out by the tool for measurement of gaps in sliding bearings.

Note the adjusting provision of a cover of the shatunny bearing.
Disconnect loose leaves of the shatunny bearing and a cover of the shatunny bearing, having unscrewed 2 bolts of fastening.
Measure a gap in a rod the bearing, using the tool for measurement of gaps in sliding bearings (a plastic wire).

NOTE
The tool for measurement of gaps in bearings of sliding is available to various ranges of measurements.

Cut off a wire so that its length corresponded to width of the shatunny bearing.
Lay a wire along an axis between a radical neck of a cranked shaft of the shatunny bearing and the loose leaf of the shatunny bearing.
Establish a cover of the shatunny bearing

NOTE
That the wire did not break at removal of a cover of the shatunny bearing, remove konsistentny greasing from a shatunny neck of a cranked shaft and slightly grease the loose leaf of the shatunny bearing – do not turn a cranked shaft.

Tighten 2 bolts the moment of 13 N · m tighten on +60 ° and +15 °.
Uncover the shatunny bearing, unscrew 2 bolts.

ATTENTION
Do not confuse decimal and metric information of scale of measurement.

Measure width of the flattened-out site of a plastic wire by means of measuring scale.
Admissible gap in a rod the bearing: from 0,013 mm to 0,061 mm.
Establish the loose leaf of the shatunny bearing and a cover of the shatunny bearing.
Clear a shatunny neck of a cranked shaft of the bearing and the loose leaf of the shatunny bearing.
Slightly grease loose leaves of the shatunny bearing.
Tighten 2 bolts the moment of 13 N · m also tighten on +60 ° and +15 °.

ATTENTION
Always use M6,5 bolts. Use new bolts.

«on page back
2.8.1. Gap check in a rod the bearing
on the following page»
2.8.3. Replacement of the shatunny bearing